top of page
Writer's pictureNewsroom

DYNAMIC SCHOOL INFRASTRUCTURE

The return to school was quite eventful; the campus has undergone a drastic transformation, with new infrastructure and utilities being installed all over campus.


📷📷📷

All photos by Tushar Jain


The first thing you notice when you enter school is the towering shade installed on over Gate No.1. According to our teachers, they realized that when student and teachers are entering school or leaving after a stay back, there is nothing to “shield them from the elements”. The shade also serves the purpose of accommodating a fire truck in case of emergencies. According to Colonel Sir, the placement of the shade is 23 feet high, making it 2 feet taller than the required height.

Students also noticed a new ‘jail aesthetic’ going around the school, namely new electrical shutters being installed in the stairways. Fear not, for the shutters are only activated after 6 o’clock when the school is completely vacant. This is for added safety since locked rooms did not ensure strangers did not enter the school premises.

You may have noticed the new MP building is also under heavy construction. The amphitheater, which had not been in use for quite a while now, is now being repurposed into a children’s play area. The land is being flattened and soon artificial grass will be installed for kids to use as a playground. You may have also seen a new staircase in place, in front of the lunch hall entrance to divert the crowd of students during dispersal.

Finally, to add a finishing touch, new signboards have been put in place all over school, reminding us to conserve school resources and taking care of one another in the school community.


📷📷📷

46 views1 comment

Recent Posts

See All

1 comentario


shivangi3050
16 abr 2020

And also the net shutters in the TT area and the staircase have been appended.

Me gusta
bottom of page